Every Asset Class, Fully Modeled
From a 50-key boutique hotel to a 500,000 SF tilt-up warehouse โ full cost models, market data, building codes, and risk analysis across 21 enterprise asset classes.
Everything a Developer Needs
Before Breaking Ground
CoreMatrix consolidates weeks of pre-development research into a unified, data-backed intelligence stack โ designed to support raw-land-to-stabilized-value workflows in one platform.
Material Costs Are Volatile.
CoreMatrix Tracks the Movement.
Estimates are designed to recalibrate against tracked tariff and PPI signals. FRED BLS Producer Price Index data is integrated and applied with per-building-type material weighting. Construction material costs are historically subject to volatility; outputs reflect best-available public data at time of generation.
A Complete Pre-Development
Package in One Click
Every generated report is designed to include these intelligence modules โ plus a multi-page PDF formatted for lenders, partners, and investment committees.
| Yr | NOI | DSCR |
| 1 | $612K | 1.42 |
| 2 | $648K | 1.50 |
| 3 | $686K | 1.59 |
| 4 | $726K | 1.68 |
| 5 | $769K | 1.78 |
| IRR | 18.4% | |
City-Level Data for Better Decisions
Real market intelligence โ cap rates, vacancy, rents, permit timelines, zoning complexity, and developer approval scores for every US metro.
| Market | Score | Cost Factor | Permit | Hotel RevPAR | MF Rent/Unit | Office Cap | Industrial Cap | Risk |
|---|---|---|---|---|---|---|---|---|
| ๐ค Missouri City, TX 77459 | 87 | 0.92ร | 4โ10 mo | $118 | $1,280/mo | 7.8% | 5.8% | LOW |
| ๐ Dallas, TX | 85 | 0.94ร | 4โ10 mo | $112 | $1,320/mo | 7.8% | 5.6% | LOW |
| โ๏ธ Phoenix, AZ | 83 | 0.95ร | 5โ12 mo | $118 | $1,380/mo | 7.8% | 5.6% | LOW |
| ๐ Charlotte, NC | 82 | 0.96ร | 6โ14 mo | $105 | $1,420/mo | 7.6% | 5.8% | LOW |
| ๐ต Nashville, TN | 81 | 0.97ร | 6โ14 mo | $142 | $1,680/mo | 7.4% | 5.6% | LOW-MED |
| ๐ Austin, TX | 77 | 1.02ร | 6โ14 mo | $138 | $1,580/mo | 7.8% | 5.8% | LOW-MED |
| ๐ Denver, CO | 72 | 1.06ร | 8โ16 mo | $132 | $1,820/mo | 7.5% | 5.4% | MEDIUM |
| ๐ด Miami, FL | 74 | 1.04ร | 8โ18 mo | $178 | $2,280/mo | 7.4% | 5.6% | MEDIUM |
| ๐ Washington, DC | 65 | 1.15ร | 10โ20 mo | $152 | $2,400/mo | 7.8% | 5.4% | MED-HIGH |
| ๐ Los Angeles, CA | 55 | 1.20ร | 12โ30 mo | $162 | $2,600/mo | 7.8% | 4.8% | HIGH |
| ๐ฝ New York, NY | 38 | 1.30ร | 18โ48 mo | $218 | $4,200/mo | 6.8% | 5.0% | VERY HIGH |
Sources: CBRE ยท JLL ยท CoStar ยท STR ยท BLS FRED PPI Q3 2025. Updated quarterly.
200+ Line-Item Materials,
3-Tier Pricing
Auto-scaled material quantities with Contractor, Specification, and High-Specification pricing for every major category โ concrete, steel, MEP, finishes, and specialty items including hospital-grade.
Architectural Views,
Designed to Render Fast.
Front, side, back elevations, floor plans, interactive 3D models, and 4D animated construction sequences โ across 21 building types. No CAD software needed.
Ask Anything. Get Data-Backed Answers.
In Plain English.
The CoreMatrix AI chat assistant knows your current project and can answer any follow-up question like an expert construction economist. Powered by Claude (Anthropic).
I can answer questions about our platform, pricing, building types, and provide illustrative construction cost scenarios. Try:
Rate Calculator & Project Comparison
Built-in construction loan calculator and multi-market comparison โ stress-test any deal without leaving the platform.
Every Loan Program,
Matched to Your Project
8 major construction loan programs with 2025 rates, LTV, terms, and best-fit use cases โ all built into the platform with a live rate calculator.
Designed for Global Builders
CoreMatrix coverage spans 198 global cities โ designed to support local cost factors, currencies, PPI sources, building codes, and permit benchmarks. One-click activation.